PROGRESS
Current Progress
General
-
Update of Gantt Chart
-
Preparation of final report
-
Update of website
-
Structural Drawings
-
3D Modelling
-
3D Printing
Structure
-
Finalisation of member dimensions
-
Design structure for transport
-
Fabrication sequence
-
Installation sequence
-
Operations & Maintenance
-
Cables Arrangement
-
Decomissioning
Foundations
-
Finalisation of pile dimensions
-
Scour protection strategy
Connections
-
Design of steel sleeve connection between pile and sleeve
-
Bolts design
Environmental, Cost and Risks
-
Final total cost of project
-
Final design risk assessment
-
Material Take Off Report
-
Updates and upgrades on previous works