General
  • Update of Gantt Chart 

​​

  • Preparation and Presentation for the Pin Up Session on Friday 1st of June​​

​​

  • Update of website â€‹â€‹

Pin Up Session - Presentation in front of an industry representative

Structure 
  • Carried out ULS and SLS checks on Oasys GSA

  • Carried out NFA on Abaqus

  • Carried out FLS checks on Matlab

  • Optimisation of member dimensions to reduce material costs

Connections

​​

  • Structural members welding design

  • Turbine-member connection welding design

  • Brainstorming for the connections structure-pile

  • Models and drawings 

Foundations
  • Changed the foundations to steel tubular piles

  • Performed p-y curve checks on lateral capacity of foundations

  • Optimised the dimensions of the steel tubular piles

  • Checks on pile global buckling and plugging

Environmental, Cost and Risks 
  • Final cost estimate of project

​​

  • CO2 Savings (final estimate)

​​

  • Updates and upgrades on previous works

Steel Sleeve Column  

Solutions for the connection pile-structure