PROGRESS
Week 3
General
-
Update of Gantt Chart
​​
-
Preparation and Presentation for the Pin Up Session on Friday 1st of June​​
​​
-
Update of website ​​

Pin Up Session - Presentation in front of an industry representative
Structure
-
Carried out ULS and SLS checks on Oasys GSA
-
Carried out NFA on Abaqus
-
Carried out FLS checks on Matlab
-
Optimisation of member dimensions to reduce material costs
Connections
​​
-
Structural members welding design
-
Turbine-member connection welding design
-
Brainstorming for the connections structure-pile
-
Models and drawings
Foundations
-
Changed the foundations to steel tubular piles
-
Performed p-y curve checks on lateral capacity of foundations
-
Optimised the dimensions of the steel tubular piles
-
Checks on pile global buckling and plugging
Environmental, Cost and Risks
-
Final cost estimate of project
​​
-
CO2 Savings (final estimate)
​​
-
Updates and upgrades on previous works
Solutions for the connection pile-structure