top of page

PROGRESS

Current Progress
General
  • Update of Gantt Chart â€‹

  • Preparation of fi​​nal report​

  • Update of website 

  • Structural Drawings 

  • 3D Modelling

  • 3D Printin​​g

​

Structure 
  • Finalisation of member dimensions 

  • Design structure for transport

  • Fabrication sequence 

  • Installation sequence 

  • Operations & Maintenance 

  • Cables Arrangement 

  • Decomissioning

Foundations
  • Finalisation of pile dimensions 

​

  • Scour protection strategy

Connections
  • Design of steel sleeve connection between pile and sleeve​

​

  • Bolts design 

​

​​

Environmental, Cost and Risks 
  • Final total cost of project​

​

  • Final design risk assessment

​

  • Material Take Off Report

​​

  • Updates and upgrades on previous works

​