PROGRESS
Current Progress
General
-
Update of Gantt Chart ​
-
Preparation of fi​​nal report​
-
Update of website
-
Structural Drawings
-
3D Modelling
-
3D Printin​​g
​
Structure
-
Finalisation of member dimensions
-
Design structure for transport
-
Fabrication sequence
-
Installation sequence
-
Operations & Maintenance
-
Cables Arrangement
-
Decomissioning
Foundations
-
Finalisation of pile dimensions
​
-
Scour protection strategy
Connections
-
Design of steel sleeve connection between pile and sleeve​
​
-
Bolts design
​
​​
Environmental, Cost and Risks
-
Final total cost of project​
​
-
Final design risk assessment
​
-
Material Take Off Report
​​
-